ISO/IEC 20000-1 — Service Management (change management, §8.5.1)

ISO/IEC 20000-1 — Service Management (change management, §8.5.1) — 100% of in-scope requirements covered.

2 requirements · 1 in scope (1 enforced) · 1 out-of-scope (outside KYE™’s authority layer). The 100% is weighted over the in-scope base.

ISO/IEC 20000-1: requirement → the KYE™ artefact that enforces it

Demo data

You learn: Which requirements KYE™ enforces at runtime and with which artefact. You can: Walk the requirements.

How this widget is built
Demonstrates
KYE™ Compliance Mapping Rail™
Components
  • Framework requirement (clause)
  • Coverage status
  • KYE™ enforcement artefact (event, decision-record field, Evidence Pack™ entry)
Flow
Clause → status → the KYE™ artefact that enforces it, enforced requirements first. Architecture diagram
Used on

Source: ISO/IEC 20000-1 — Service Management (change management, §8.5.1) — International standard (IT service management system). KYE Protocol™ governs the SUBSET that resolves at the action boundary — the moment an AI-driven production action (a rollback / hotfix / infra-change) moves toward a consequential effect — under a recorded change-authority decision, with the change-class due-diligence recorded, replay-provable provenance, and named sign-off. KYE™ does not detect the incident, perform RCA, monitor the system, or operate the change-management tooling. · License: ISO/IEC 20000-1 is published by ISO/IEC; KYE™ registry references its change-management clause descriptively for mapping purposes and asserts no ownership of the standard text.

By category

CategoryReqsEnforcedDesignedAdvisoryDeferredCoverage
Change management — authorization & records (enforced action-boundary subset)11000100%
Service-management system operation (out-of-scope — service-management / itsm)100000%

Every requirement → the KYE™ artefact that enforces it

IDTitleStatusKYE™ enforcement
iso-iec-20000-1.clause8-5-1-change-managementChange management (§8.5.1): an AI-proposed production change is authorized & recorded before deploymentenforcedrule_packs: kye:rule-pack:production-action-authority
dictionaries: internal
engines: internal, internal, internal
audit_events: kye.purpose.request.v1, kye.purpose.admissibility.v1, kye.evidence.decision_map.v1, kye.evidence.pack.v1
constitution_refs: constitution/12-PURPOSE-PERMISSION.md, constitution/13-RESILIENCE-LOOP.md
iso-iec-20000-1.smsystem-operationOperating the service-management system, SLAs, and continual-improvement programmeout-of-scope(no enforcement cited)

Canonical KYE™ surfaces referenced on this page: KYE Protocol™.